  1. Unit 17 Marks High Priority

    Define field capacity and wilting coefficient (permanent wilting point) and explain their significance in irrigation scheduling.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    Explain methods to improve / enhance the duty of water in irrigation systems.

    Predicted for DEC-2026

  3. Unit 17 Marks High Priority

    Explain different surface and subsurface methods of irrigation and their suitability for different soils and crops.

    Predicted for DEC-2026

  4. Unit 17 Marks High Priority

    Define consumptive use of water and explain methods for its determination.

    Predicted for DEC-2026

  5. Unit 27 Marks High Priority

    Explain the causes and effects of salt efflorescence and its impact on soil quality and crop productivity.

    Predicted for DEC-2026

  6. Unit 27 Marks High Priority

    Discuss the necessity of groundwater recharge and describe methods for improving groundwater storage and recharge.

    Predicted for DEC-2026

  7. Unit 27 Marks High Priority

    When 3.68 million m3 of water was pumped out from an unconfined aquifer of 6.2 km2 area extent, the water table was observed to go down by 2.6 m. Determine the specific yield of the aquifer.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    Rain gauge stations A, B, C, D, E and F have normal annual rainfall of 620, 564, 478, 616, 573 and 392 mm respectively. During a storm, stations B, C, D, E and F recorded 22, 29, 35, 13 and 25 mm respectively. Estimate the missing storm rainfall at station A by arithmetic average and normal-ratio methods.

    Predicted for DEC-2026

  9. Unit 37 Marks High Priority

    Explain the methods for measuring precipitation/rainfall and the types/differences of recording and non-recording rain gauges.

    Predicted for DEC-2026

  10. Unit 37 Marks High Priority

    Explain the concept of unit hydrograph and give the steps to derive a unit hydrograph from an observed runoff hydrograph.

    Predicted for DEC-2026

  11. Unit 37 Marks High Priority

    Define infiltration and explain the various factors affecting infiltration.

    Predicted for DEC-2026

  12. Unit 47 Marks High Priority

    Compare / discuss Kennedy's theory and Lacey's theory for canal design, including limitations.

    Predicted for DEC-2026

  13. Unit 47 Marks High Priority

    Design an irrigation channel by Kennedy's theory to carry a discharge of 5 cumecs. Take m = 1.0, N = 0.0225 and B/D ratio = 4.40.

    Predicted for DEC-2026

  14. Unit 47 Marks High Priority

    Design an irrigation canal using Lacey's theory for the following data: Discharge = 55 cumecs, Silt factor = 1.6, Side slope = 0.5H:1V.

    Predicted for DEC-2026

  15. Unit 47 Marks High Priority

    Describe / explain different types of canal irrigation hydraulic structures such as head regulator, cross regulator, escape, fall and outlet.

    Predicted for DEC-2026

  16. Unit 57 Marks High Priority

    Explain various flood control measures including structural and non-structural measures for control and regulation of flood waters.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in