CE-603 (A) · Water Resource Engineering/Unsolved PYQ Paper
CE-603-A Water Resources Engineering - Dec 2024 Question Paper
Under each question, How to answer lists the points an answer should cover, outlined by CampusPrep from the syllabus. Check the details against your textbook.
-
7 MarksaDiscuss methods to enhance the duty of water in irrigation systems?
How to answer
- Define duty, delta, base period and their relation
- List factors reducing duty
- Discuss methods: lining, rotation, soil management, crop selection, outlet control
-
7 MarksbThe GCA for an irrigation canal is 20,000 hectares out of which 75% is CCA. The intensity of irrigation is 40% for Rabi and 10% for rice. If kor period is 4 weeks for Rabi and 2.5 weeks for rice, determine the outlet discharge. Outlet factors for Rabi and Rice may be assumed as 1800 ha/cumecs and 800 ha/cumecs. Also calculate delta for each case.
How to answer
- Compute CCA = 75% of GCA
- Compute areas under Rabi and Rice from intensities
- Compute outlet discharge = Area / Outlet factor for each crop
- Compute delta = 8.64*B/Duty relation
-
7 MarksaIdentify principal crops and discuss about their respective water requirements?
How to answer
- Identify Kharif, Rabi, perennial principal crops
- State growing seasons and examples
- Discuss water requirement: consumptive use, delta, duty
- Compare rice vs wheat vs sugarcane requirements
-
7 MarksbExplain the causes and effects of salt efflorescence and its impact on soil quality and crop productivity?
How to answer
- Define salt efflorescence / salinity
- List causes: waterlogging, poor drainage, arid climate, saline irrigation
- Explain effects on soil structure and fertility
- Explain impact on crop productivity and reclamation
-
7 MarksaWhen $3.68$ million $m^3$ of water was pumped out from an unconfined aquifer of $6.2 km^2$ area extent, the water table was observed to go down by $2.6 m$. What is the specific yield of the aquifer? During a monsoon season if the water table of the same aquifer goes up by $10.8 m$, what is the volume of recharge?
How to answer
- Define specific yield = volume pumped / (area x drawdown)
- Compute specific yield from 3.68 million m3, 6.2 km2, 2.6 m
- Define recharge = specific yield x area x rise
- Compute recharge for 10.8 m rise
-
7 MarksbDiscuss the necessity of groundwater recharge and methods for improving groundwater storage?
How to answer
- Explain groundwater depletion and need for recharge
- Discuss natural vs artificial recharge necessity
- List methods: percolation tanks, recharge wells, check dams, rainwater harvesting
- Benefits for storage improvement
-
7 MarksaExplain various methods for computation of average rainfall over a basin. State the advantages and disadvantages of each method?
How to answer
- Describe Arithmetic mean, Thiessen polygon, Isohyetal methods
- Give formulas and procedure for each
- State advantages and disadvantages
- State applicability for basin
-
7 Marksb
Given below are the ordinates of a unit hydrograph for a storm of 4-hour duration. Find ordinates of flood hydrograph when the maximum flood observed was $400\, m^3/s$ and base flow was $250\, m^3/s$.
Time (hours) 0 4 8 12 16 20 24 Flow ($m^3/s$) 0 1500 1200 600 220 80 0 How to answer
- Compute peak of flood hydrograph = max flood - base flow
- Compute multiplying factor = peak / UH peak
- Multiply UH ordinates by factor to get DRH ordinates
- Add base flow to get flood hydrograph ordinates
-
7 MarksaDiscuss techniques for estimating missing rainfall data in hydrological studies.?
How to answer
- Define missing rainfall data problem
- Explain normal ratio, inverse distance, regression methods
- State selection criteria and steps
- Mention advantages/limitations
-
7 MarksbDefine hydraulic structures and their role in water resource management?
How to answer
- Define hydraulic structures
- List types: dams, weirs, barrages, canals, spillways
- Explain role in storage, diversion, flood control
- Link to water resource management
-
7 MarksaFor a channel, the discharge Q, rugosity coefficient N, critical velocity ratio m, and the bed width-depth ratio B/D are given. Explain how would you design the channel using Kennedy's theory?
How to answer
- State Kennedy's theory: V0 = 0.55*m*D^0.64 and Q = A*V
- Use given Q, N, m, B/D ratio
- Solve trial for depth D and width B
- Check regime and final section
-
7 MarksbDesign an irrigation canal using Lacey's theory for the following data: Discharge $= 55$ cumecs, Silt factor $= 1.6$, Side slope $= 0.5:1$.
How to answer
- Compute Lacey's regime velocity, hydraulic radius, area
- Determine width, depth, slope using silt factor f=1.6
- Apply side slope 0.5:1 for final section
- Summarize designed dimensions
-
7 MarksaDiscuss cost-benefit analysis as a tool for evaluating the effectiveness of flood control projects?
How to answer
- Define cost-benefit analysis and B-C ratio
- List costs and benefits of flood control projects
- Explain evaluation procedure and decision criteria
- Discuss limitations
-
7 MarksbExplain how return periods and probability distributions are used to assess flood risk?
How to answer
- Define return period T = 1/p
- Explain probability distributions: Gumbel, Log-Pearson
- Show use in flood frequency and risk assessment
- Explain design flood selection
-
14 MarksWrite short notes on any two?
- a)Wilting coefficient and field capacity
- b)Methods for improving groundwater storage
- c)Infiltration indices
- d)Canal losses and canal lining
How to answer
- Select any two topics from list
- Define key terms and governing concepts
- Explain significance with examples
- Add sketches/formulas where relevant