Skip to content
CE-603 (A) · Water Resource Engineering/Important Questions

Water Resource Engineering (CE-603 (A)) - Important Questions

  1. 7 Marks High Priority Asked: 2026, 2025

    Define field capacity and wilting coefficient (permanent wilting point) and explain their significance in irrigation scheduling.

    Appeared 2x (2026, 2025)

  2. 7 Marks Medium Priority Asked: 2026

    Discuss the development of irrigation in India and explain its importance in agriculture.

    Appeared 1x (2026)

  3. 7 Marks Medium Priority Asked: 2026

    Numerical on GCA, CCA, intensity of irrigation and outlet factor to determine outlet discharge and delta

    Appeared 1x (2026)

  4. 7 Marks Medium Priority Asked: 2024, 2023

    Explain methods to improve / enhance the duty of water in irrigation systems

    Appeared 2x (2024, 2023)

  5. 7 Marks Medium Priority Asked: 2025, 2020

    Explain different / surface and subsurface methods of irrigation and their suitability

    Appeared 2x (2025, 2020)

  6. 7 Marks Medium Priority Asked: 2025

    Explain the necessity, advantages, and disadvantages of irrigation.

    Appeared 1x (2025)

  7. 7 Marks Medium Priority Asked: 2025

    Define consumptive use and explain methods for its determination.

    Appeared 1x (2025)

  8. 10 Marks Low Priority Asked: 2024, 2020

    Write a short note on crop ratio, crop rotation and intensity of irrigation.

    Appeared 2x (2024, 2020)

  9. 7 Marks Low Priority Asked: 2024

    Derive the relationship between duty, delta and base period

    Appeared 1x (2024)

  10. 7 Marks Low Priority Asked: 2024

    The GCA for an irrigation canal is 20,000 hectares out of which 75% is CCA. The intensity of irrigation is 40% for Rabi and 10% for rice. If kor period is 4 weeks for Rabi and 2.5 weeks for rice, determine the outlet discharge. Outlet factors for Rabi and Rice may be assumed as 1800 ha/cumecs and 800 ha/cumecs. Also calculate delta for each case.

    Appeared 1x (2024)

  11. 7 Marks Low Priority Asked: 2024

    After how many days will you supply water to soil in order to ensure efficient irrigation of the given crop, if

    Appeared 1x (2024)

  12. 7 Marks Low Priority Asked: 2024

    Identify principal crops and discuss about their respective water requirements?

    Appeared 1x (2024)

  13. 7 Marks High Priority Asked: 2026, 2025, 2024

    Explain the causes and effects of salt efflorescence and its impact on soil quality and crop productivity.

    Appeared 3x (2026, 2025, 2024)

  14. 7 Marks High Priority Asked: 2025, 2024

    Discuss the necessity of groundwater recharge and describe methods for improving groundwater storage and recharge.

    Appeared 2x (2025, 2024)

  15. 7 Marks Medium Priority Asked: 2026

    Explain aquifer properties: porosity, permeability, transmissibility and storage coefficient.

    Appeared 1x (2026)

  16. 7 Marks Medium Priority Asked: 2026

    Differentiate between waterlogging and salinity and explain their remedial measures.

    Appeared 1x (2026)

  17. 7 Marks Medium Priority Asked: 2024, 2022

    Calculate specific yield of an unconfined aquifer from pumped volume, basin area and water-table decline, and related recharge or porosity estimation.

    Appeared 2x (2024, 2022)

  18. 7 Marks Medium Priority Asked: 2025, 2020

    Explain the types of aquifers, including confined and unconfined aquifers, and their properties.

    Appeared 2x (2025, 2020)

  19. 7 Marks Medium Priority Asked: 2025, 2020

    Explain water logging, its causes, effects and prevention.

    Appeared 2x (2025, 2020)

  20. 7 Marks Low Priority Asked: 2024

    What are infiltration galleries? And how do they contribute to groundwater recharge?

    Appeared 1x (2024)

  21. 7 Marks Low Priority Asked: 2024

    Discuss strategies for reclaiming salt-affected lands and restoring soil fertility.

    Appeared 1x (2024)

  22. 7 Marks Low Priority Asked: 2024

    A 30 cm diameter well completely penetrates an artesian aquifer. The thickness of strainer is 25 m. Determine the discharge from the well when the draw down in the well is 4 m and the coefficient of permeability is 45 m/day. Assume radius of influence as 350 m.

    Appeared 1x (2024)

  23. 7 Marks Low Priority Asked: 2023

    Write a short note on rain water harvesting.

    Appeared 1x (2023)

  24. 7 Marks Low Priority Asked: 2023

    Explain specific yield and specific retention.

    Appeared 1x (2023)

  25. 7 Marks High Priority Asked: 2026, 2024

    Estimate missing storm rainfall at inoperative station A from neighbouring stations using arithmetic average and normal-ratio methods.

    Appeared 2x (2026, 2024)

  26. 7 Marks High Priority Asked: 2025, 2024

    Explain the methods for measuring precipitation/rainfall and the types/differences of recording and non-recording rain gauges.

    Appeared 2x (2025, 2024)

  27. 7 Marks Medium Priority Asked: 2025, 2023

    Define infiltration and explain the various factors affecting infiltration.

    Appeared 2x (2025, 2023)

  28. 7 Marks Medium Priority Asked: 2025, 2023

    Explain the concept of unit hydrograph and give the steps to derive a unit hydrograph from an observed runoff hydrograph.

    Appeared 2x (2025, 2023)

  29. 7 Marks Medium Priority Asked: 2026, 2020

    Define precipitation, describe its different forms/types, and explain related aspects such as factors affecting precipitation and distinction between precipitation and rainfall.

    Appeared 2x (2026, 2020)

  30. 7 Marks Medium Priority Asked: 2026, 2020

    What do you understand by the rainfall intensity? Explain the methods for the Preparation of the intensity duration curves.

    Appeared 2x (2026, 2020)

  31. 7 Marks Medium Priority Asked: 2025

    Describe the hydrological cycle with a neat sketch.

    Appeared 1x (2025)

  32. 7 Marks Low Priority Asked: 2024

    Explain the various methods for computation of average rainfall over a basin with their advantages and disadvantages.

    Appeared 1x (2024)

  33. 7 Marks Low Priority Asked: 2024

    Given unit hydrograph ordinates, compute flood hydrograph ordinates for observed peak flow and base flow.

    Appeared 1x (2024)

  34. 7 Marks Low Priority Asked: 2024

    Discuss techniques for estimating missing rainfall data in hydrological studies.

    Appeared 1x (2024)

  35. 7 Marks Low Priority Asked: 2024

    Discuss the significance of depth-area duration curves in hydrological studies.

    Appeared 1x (2024)

  36. 7 Marks Low Priority Asked: 2023

    Explain the Thiessen polygon method for calculating mean precipitation over an area.

    Appeared 1x (2023)

  37. 7 Marks High Priority Asked: 2026, 2025, 2020

    Compare / discuss Kennedy's theory and Lacey's theory for canal design, including limitations.

    Appeared 3x (2026, 2025, 2020)

  38. 7 Marks High Priority Asked: 2026, 2025

    Describe / explain different types of canal irrigation hydraulic structures such as head regulator, cross regulator, escape, fall and outlet

    Appeared 2x (2026, 2025)

  39. 7 Marks High Priority Asked: 2026, 2024, 2020

    Design an irrigation channel using Kennedy's theory to carry a given discharge for given rugosity, critical velocity ratio, slope / section parameters.

    Appeared 3x (2026, 2024, 2020)

  40. 7 Marks High Priority Asked: 2025, 2024

    Explain the objectives/importance of canal lining and the types/materials commonly used for lining.

    Appeared 2x (2025, 2024)

  41. 7 Marks High Priority Asked: 2024, 2023, 2022

    Design a regime irrigation channel/canal using Lacey's theory for given discharge, silt factor and side slopes.

    Appeared 3x (2024, 2023, 2022)

  42. 7 Marks Medium Priority Asked: 2026

    Explain the design principles and assumptions involved in the design of unlined canals.

    Appeared 1x (2026)

  43. 7 Marks Medium Priority Asked: 2025

    Explain the functions of weirs and barrages / comparison of weirs vs barrages

    Appeared 1x (2025)

  44. 7 Marks Low Priority Asked: 2024

    Define hydraulic structures and explain their role in water resource management

    Appeared 1x (2024)

  45. 7 Marks Low Priority Asked: 2024

    Explain the procedure for designing a channel using Kennedy's theory for given Q, N, m and B/D ratio.

    Appeared 1x (2024)

  46. 7 Marks Low Priority Asked: 2024

    Explain the factors influencing the alignment of canals and their significance in design.

    Appeared 1x (2024)

  47. 7 Marks Low Priority Asked: 2023

    What is an aqueduct and what is its design procedure?

    Appeared 1x (2023)

  48. 7 Marks Low Priority Asked: 2023

    What factors affect the selection of a suitable type of cross drainage work?

    Appeared 1x (2023)

  49. 7 Marks High Priority Asked: 2026, 2022

    Explain the Muskingum method of channel routing with necessary equations and steps involved.

    Appeared 2x (2026, 2022)

  50. 7 Marks Medium Priority Asked: 2024

    Explain flood frequency analysis using return periods and probability distributions to assess flood risk and compute design discharge for a catchment.

    Appeared 2x (2024)

  51. 7 Marks Medium Priority Asked: 2026, 2020

    Explain the concept of flood control and discuss the various types of flood control reservoirs

    Appeared 2x (2026, 2020)

  52. 7 Marks Medium Priority Asked: 2026

    Describe various methods used for flood estimation, including empirical, rational, and unit hydrograph methods. Compare their applicability.

    Appeared 1x (2026)

  53. 7 Marks Low Priority Asked: 2024, 2020

    Explain the different methods of flood control including the use of reservoirs and channels to control and regulate floodwaters

    Appeared 2x (2024, 2020)

  54. 7 Marks Low Priority Asked: 2024

    Discuss cost-benefit analysis as a tool for evaluating the effectiveness of flood control projects?

    Appeared 1x (2024)

  55. 14 Marks Low Priority Asked: 2024

    Write short notes on any two?

    Appeared 1x (2024)

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in