TQM and SQC (ME-504 (B)) - Important Questions
-
Unit 17 Marks High Priority
What is ISO and the ISO 9000 quality system, and what are its salient features?
Predicted for DEC-2026
-
Unit 17 Marks High Priority
What are the principles of TQM and what is meant by quality functions?
Predicted for DEC-2026
-
Unit 17 Marks High Priority
What are the requirements of Business Process Re-engineering (BPR)? Explain.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Write about Malcolm Bridge National Quality Award.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Define total quality leadership.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Explain the inter-relationships among Deming's 14 points.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Discuss the Taguchi quality loss function.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain the PDSA cycle (Plan, Do, Study, Act) and construction of R-charts and s-charts including trial control limits and out-of-control points.
Predicted for DEC-2026
-
Unit 314 Marks High Priority
Control charts for X-bar and R are maintained on certain dimensions of a manufactured part, measured in mm. The subgroup size is 5. After 20 subgroups, sum of X-bar = 886.4 and sum of R = 88.6. Construct 3-sigma control limits for X-bar and R charts and estimate the process standard deviation.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain the concept of fraction defective and the theory, construction and use of the p-chart for fraction defective, including why it is used despite being less informative than X-bar and R-chart.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
State and explain the conditions favourable for economic use of control charts for defects per unit.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain the cause-and-effect (Ishikawa) diagram to identify process defects.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain the seven wastes identified for elimination in continuous improvement of production processes.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Differentiate between Single Sampling Plan and Double Sampling Plan.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Discuss / explain the Operating Characteristic (OC) curve and its characteristics.
Predicted for DEC-2026
Quick Add to Notes
Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.
Create free accountHave an account? Log in
Notes Panel