7 MarksaList and Explain about the various equations used to determine fire demand?
How to answer
- List fire demand formulae: Kuichling's, Freeman's, National Board of Fire Underwriters, Ministry of Urban Development
- Write each equation with terms defined
- Explain applicability / population range
- Comparison of results
-
7 MarksbA water supply scheme has to be designed for a city having a population of 1,20,000. Estimate the total draft (in MLD) which is required for an average water consumption of 220 lpcd. Use Kuichling's method to calculate fire demand?
How to answer
- Calculate average daily demand = population x per capita
- Calculate fire demand by Kuichling's method $Q = 3182\sqrt{P}$
- Add fire demand to average/max daily to get total draft
- Convert to MLD
-
7 MarksaExplain various methods to determine turbidity in given water sample?
How to answer
- Define turbidity and its units (NTU/JTU)
- Explain Jackson turbidity meter
- Explain Baylis turbidimeter / Nephelometer
- Explain Secchi disc and laboratory procedure
-
7 MarksbA water supply scheme has to be designed for a city having population of 1,00,000. For an average water consumption of 250 LPCD. Estimate:
- i)Average daily demand
- ii)Maximum daily demand
- iii)Maximum hourly demand
- iv)Fire Demand as Per National Board of Fire under Writer's Formula
How to answer
- Average daily demand = P x q
- Maximum daily = 1.8 x average
- Maximum hourly = 1.5 x max daily / 2.7 x average
- Fire demand by National Board of Fire Underwriters / Writer's formula
-
7 MarksaWhat are intake structures? Explain about the working of canal intake?
How to answer
- Define intake structures and their functions
- Types of intakes
- Working of canal intake with components
- Neat sketch description
-
7 MarksbA city has a population of 1,50,000. Water is to be supplied at a rate of 160 litres per head per day. If the static lift of the pump is 40 metres, calculate the B.H.P of motor. The rising main is 300 m long and its diameter is 50 cm. Assume that motor efficiency is 85%, pump efficiency is 60%, f = 0.01 and peak hour demand is 1.5 times the average demand.
How to answer
- Compute average and peak discharge
- Compute total head = static lift + friction loss using Darcy-Weisbach
- Compute power $P = \rho g Q H / \eta$
- Divide by motor and pump efficiencies to get B.H.P.
-
7 MarksaDerive Stoke's law for settlement of discrete particles in water. How do you modify the law, taking into account of the temperature effect?
How to answer
- State assumptions for discrete settling
- Force balance: gravity, buoyancy, drag
- Derive terminal velocity $v_s = g(\rho_s-\rho)d^2/18\mu$
- Explain temperature effect via viscosity correction
-
7 MarksbDefine Coagulation. Write down the chemical reactions of aluminium sulphate and chlorinated copper as when used as coagulants.
How to answer
- Define coagulation and its purpose
- Write reaction of aluminium sulphate with alkalinity
- Write reaction of chlorinated copperas as coagulant
- Conditions for effective coagulation
-
7 MarksaWith the help of neat sketches, explain Manholes and Lamp holes.
How to answer
- Define manholes and lamp holes with purpose
- Provide neat sketches with components labelled
- Explain construction and spacing
- Differentiate uses
-
7 MarksbDetermine the surface overflow area for settling tank of $0.5\text{ m}^3/\text{sec}$ flow using design overflow rate as $32.5\text{ m}^3/\text{m}^2/\text{day}$. Also find the depth of the tank if detention time is 95 min. Assume L/B from 2/1 to 5/1 and length should not exceed 100 m.
How to answer
- Surface area = Discharge / overflow rate
- Volume = Q x detention time, depth = Volume / Area
- Check L/B ratio 2 to 5 and length <100 m, adjust dimensions
- Final L, B, depth
-
7 MarksaExplain in detail about the construction and laying of sewers?
How to answer
- Alignment, excavation and bedding
- Laying, jointing and testing of sewer pipes
- Backfilling, safety and ventilation
-
7 MarksbCalculate the velocity of flow and corresponding discharge in a sewer of circular section having diameter equal to 1 m laid at a gradient of 1 in 500. The sewer runs at a depth of 0.6 m. Use Manning's formula taking n = 0.012?
How to answer
- Compute hydraulic mean depth for partial flow at 0.6 m depth
- Apply Manning's formula $V = (1/n)R^{2/3}S^{1/2}$
- Compute wetted area for partial depth
- Discharge $Q = A V$
-
7 MarksaWhat is Population equivalent? Calculate the population equivalent if the average standard $BOD_5$ of industrial sewage comes out to be 300 kg/day?
How to answer
- Define population equivalent
- Standard per capita BOD ~80 g/day
- Formula PE = total BOD / per capita BOD
- Compute for 300 kg/day
-
7 MarksbFollowing observations were made on a 3% dilution of waste water. DO of aerated water = 3mg/lit DO of diluted water sample after 5 days of incubation = 0.8 mg/lit DO of waste water sample = 0.6 mg/lit. Calculate 5 day BOD. Given $K_D$ = 0.1 per day.
How to answer
- BOD = [(DO_initial - DO_final) - blank correction] / dilution fraction
- Apply 3% dilution and given DO values
- Account for $K_D = 0.1$ per day if ultimate BOD needed
- Compute 5-day BOD in mg/l
-
14 MarksWrite a short notes on any two:
- i)Sources of surface water
- ii)Disposal of sewage
- iii)Chemical parameters of sewage
- iv)Water borne diseases
How to answer
- For each chosen topic give definition and classification
- Explain key points with examples
- Mention significance in environmental engineering
- Conclude briefly