Production Planning and Control (ME-802 (D)) - Important Questions
-
14 Marks High Priority Asked: 2024
Write short notes on market analysis, synthesis from standard data, MPS, and inventory classification.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
Distinguish between job-production and batch production.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
Does India need PPC for her developing economy? Discuss.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
What is sales forecasting and what are its fields of application?
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
Differentiate between method study and work measurement. Explain the procedure of method study.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
Describe the principles of motion economy. How they are related to work place layout?
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
Analyse critically any two types of Predetermined Motion Time standard system as regards applicability and limitations for the estimation of standard time in man-machine system.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
List the information required for effective production planning.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
What are the different types of scheduling situations and methodologies? Explain any one of them in detail.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
How is line balancing done using heuristic method? What are the types and rules of heuristic methods?
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
A company uses annually 24,000 units of a raw material which costs Rs. 1.25 per unit placing each order costs Rs. 22.5 and the carrying cost is 5.4% per year of the average inventory. Find the economic lot size and the total inventory cost (including the cost of material). Should the company accept the offer made by supplier of a discount of 5% on the cost price on a single order of 24,000 units. Suppose the company works for 300 days a year. If the procurement time is 12 days and safety stock is 400 units find the reorder point, the minimum, maximum and average inventory.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
Define MRP II. What the surround failure of Manufacturing Resources Planning (MRP II) system in manufacturing management?
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
What are the advantages and disadvantages of ERP system? Explain the implementation of ERP system.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
What are the role of factory executives and workers in raising productivity? Explain it.
Appeared 1x (2024)
-
7 Marks High Priority Asked: 2024
A company has three plants at location of A, B and C which supply to warehouses located at D, E, F, G and H. Monthly plant capacities are 800, 500 and 900 units respectively. Monthly warehouse requirements are 400, 400, 500, 400 and 800 units respectively. Unit transportation (in Rs.) are given below:
From \ To D E F G H A 5 8 6 6 3 B 4 7 7 6 5 C 8 4 6 6 4 Determine an optimum distribution for the company in order to minimize the total transportation cost.
Appeared 1x (2024)
Quick Add to Notes
Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.
Create free accountHave an account? Log in
Notes Panel