Energy Audit & Management (EX-703 (B)) - Important Questions
-
Unit 17 Marks High Priority
What is energy auditing? Explain the need for energy auditing in industrial sectors.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Describe the different types of energy audits and their significance for energy conservation.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Describe the role and responsibilities of energy managers in promoting energy efficiency in an organization.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Explain the environmental aspects associated with energy consumption / utilization, including renewable and non-renewable energy sources.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Explain the adverse effects / problems of harmonics on electrical equipment and system. Mention few equipments which contribute to harmonics and why it happens.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
During April the plant recorded a maximum demand of 800 kVA at average power factor 0.80 lag. The minimum average power factor to be maintained is 0.90 lag. Calculate the kVAr rating of capacitor bank required, the new kVA demand after improvement and comment on PF penalty.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
How is an energy efficient motor different from a standard motor in construction / features? What are the advantages of energy efficient motor and why is its efficiency higher?
Predicted for DEC-2026
-
Unit 27 Marks High Priority
What are the main components of electricity (EB) billing? How do demand and energy charges influence electricity cost?
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain the working of boilers, furnaces and thermic fluid heaters. How is their efficiency computed?
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Two identical biomass fired boilers of capacity 15 TPH with full load efficiency 82% are available. Part load efficiencies at 75% and 45% load are 78% and 66% respectively. For a given steam demand determine optimal loading of the boilers and estimate fuel savings.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Discuss the importance of condensate recovery and flash steam utilization in thermal systems with example.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain the factors affecting pump performance and energy conservation measures / opportunities in pumping systems, including proper selection and operation for efficiency.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Describe methods to improve energy efficiency in compressed air systems. Mention common losses and their remedies.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
What is the (simple) payback period, how is it calculated, and why is it important in energy investment decisions? Discuss significance of risk analysis in evaluating it.
Predicted for DEC-2026
-
Unit 514 Marks High Priority
Write short notes on (any two): a) Life Cycle Costing - process and applications b) ESCO concept c) Net Present Value in energy projects d) Preliminary vs detailed energy audit.
Predicted for DEC-2026