EX-702 (C) · High Voltage Engineering/Important Questions

High Voltage Engineering (EX-702 (C)) - Important Questions

  1. Unit 17 Marks High Priority

    Explain the concept of High Voltage (HV) technology, its significance and necessity in modern power systems including high DC voltage, and the voltage levels classified under HV, EHV and UHV.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    Explain the advantages and limitations of transmitting electrical power at high transmission voltages.

    Predicted for DEC-2026

  3. Unit 27 Marks High Priority

    Explain Townsend's primary (first) and secondary (second) ionization processes in gaseous dielectrics and how they lead to gas breakdown.

    Predicted for DEC-2026

  4. Unit 27 Marks High Priority

    What is meant by the intrinsic strength of a solid dielectric and by what mechanisms does breakdown occur in solid dielectrics in practice, including electronic breakdown?

    Predicted for DEC-2026

  5. Unit 27 Marks High Priority

    State and derive Paschen's law. Discuss the significance of the Paschen minimum and its practical implications for high voltage equipment design.

    Predicted for DEC-2026

  6. Unit 37 Marks High Priority

    Explain the construction and working of the Cockcroft-Walton voltage multiplier circuit for generation of high DC voltages, including its advantages and limitations.

    Predicted for DEC-2026

  7. Unit 37 Marks High Priority

    Explain the triggering of an impulse generator using a trigatron (three-electrode) gap, its functions, and why triggering is required and preferred.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    What is the analysis of single stage impulse generator? Derive the expression for output impulse voltage.

    Predicted for DEC-2026

  9. Unit 47 Marks High Priority

    Explain the principle, construction and operation of the standard sphere gap for measurement of peak high AC, DC and impulse voltages and the factors influencing the measurement.

    Predicted for DEC-2026

  10. Unit 47 Marks High Priority

    Discuss the working principle and compare the advantages, disadvantages and performance of resistance, capacitance, and mixed R-C potential dividers for impulse voltage measurement.

    Predicted for DEC-2026

  11. Unit 47 Marks High Priority

    Describe the construction and principle of operation of the generating voltmeter for measuring high DC voltages with a suitable diagram, including its applications and limitations.

    Predicted for DEC-2026

  12. Unit 47 Marks High Priority

    Explain the operation of electrostatic voltmeter with neat sketch, its principle, construction and limitations.

    Predicted for DEC-2026

  13. Unit 57 Marks High Priority

    Describe the tests conducted on high-voltage insulators including flash-over voltage, mechanical strength and puncture voltage tests.

    Predicted for DEC-2026

  14. Unit 57 Marks High Priority

    What is a circuit breaker? Describe the short-circuit test and dielectric test performed on circuit breakers and their objectives.

    Predicted for DEC-2026

  15. Unit 514 Marks High Priority

    Write short notes on any two of the following: (i) Testing of cables and isolators (ii) High voltage tests on transformers (iii) Tests on circuit breakers and insulators.

    Predicted for DEC-2026