  1. Unit 17 Marks High Priority

    What do you understand by restructuring process? Describe various entities involved in restructuring process.

    Predicted for DEC-2026

  2. Unit 27 Marks High Priority

    Compare various load flow / power flow solution methods used in power system analysis.

    Predicted for DEC-2026

  3. Unit 27 Marks High Priority

    Explain the Gauss-Seidel method for load flow analysis, including algorithm/flow chart for PQ buses and modification for PV buses.

    Predicted for DEC-2026

  4. Unit 27 Marks High Priority

    Formulate the static power flow equations for a power system and explain classification of buses for load flow studies.

    Predicted for DEC-2026

  5. Unit 214 Marks High Priority

    Determine the Ybus for the 4-bus system from given line series impedances neglecting shunt capacitance of the lines.

    Predicted for DEC-2026

  6. Unit 47 Marks High Priority

    Explain generation/production and absorption of reactive power in power system components and methods used for it.

    Predicted for DEC-2026

  7. Unit 47 Marks High Priority

    Discuss the various voltage control methods used in modern power systems.

    Predicted for DEC-2026

  8. Unit 57 Marks High Priority

    Derive the swing equation and explain its physical significance in the context of rotor angle stability.

    Predicted for DEC-2026

  9. Unit 57 Marks High Priority

    A generator is delivering power to an infinite bus. Given pre-fault, during-fault and post-fault maximum power transfer capabilities, determine the critical clearing angle by equal-area criterion.

    Predicted for DEC-2026

  10. Unit 37 Marks High Priority

    Explain why it is necessary to keep strict limits on power system frequency variations.

    Predicted for DEC-2026

  11. Unit 37 Marks High Priority

    A 100 MVA 50 Hz turbo alternator operates at no load. A load is suddenly applied and governor action starts after a time lag due to inertia. Calculate the frequency drop before governor action, given H, power imbalance and time lag.

    Predicted for DEC-2026

  12. Unit 57 Marks High Priority

    Differentiate between steady-state and transient stability of a power system connected to infinite bus and discuss the factors affecting steady-state and transient stability.

    Predicted for DEC-2026

  13. Unit 27 Marks High Priority

    Write a short note on economic dispatch of power system.

    Predicted for DEC-2026

  14. Unit 414 Marks High Priority

    Explain the working of an automatic voltage regulator for turbo generators with the help of a block diagram.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in