Power System‑II (EX-601) - Important Questions
-
Unit 17 Marks High Priority
What do you understand by restructuring process? Describe various entities involved in restructuring process.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Compare various load flow / power flow solution methods used in power system analysis.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Explain the Gauss-Seidel method for load flow analysis, including algorithm/flow chart for PQ buses and modification for PV buses.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Formulate the static power flow equations for a power system and explain classification of buses for load flow studies.
Predicted for DEC-2026
-
Unit 214 Marks High Priority
Determine the Ybus for the 4-bus system from given line series impedances neglecting shunt capacitance of the lines.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain generation/production and absorption of reactive power in power system components and methods used for it.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Discuss the various voltage control methods used in modern power systems.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Derive the swing equation and explain its physical significance in the context of rotor angle stability.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
A generator is delivering power to an infinite bus. Given pre-fault, during-fault and post-fault maximum power transfer capabilities, determine the critical clearing angle by equal-area criterion.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain why it is necessary to keep strict limits on power system frequency variations.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
A 100 MVA 50 Hz turbo alternator operates at no load. A load is suddenly applied and governor action starts after a time lag due to inertia. Calculate the frequency drop before governor action, given H, power imbalance and time lag.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Differentiate between steady-state and transient stability of a power system connected to infinite bus and discuss the factors affecting steady-state and transient stability.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Write a short note on economic dispatch of power system.
Predicted for DEC-2026
-
Unit 414 Marks High Priority
Explain the working of an automatic voltage regulator for turbo generators with the help of a block diagram.
Predicted for DEC-2026
Quick Add to Notes
Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.
Create free accountHave an account? Log in
Notes Panel