Skip to content
EX-503 (A) · Electrical Power Generation & Economy/Important Questions

Electrical Power Generation & Economy (EX-503 (A)) - Important Questions

  1. Unit 17 Marks High Priority

    What are the factors / considerations for selection of site / location for a hydroelectric power plant?

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    Discuss the different sources of energy / electrical power generation available in nature and their relative merits, demerits and advantages.

    Predicted for DEC-2026

  3. Unit 17 Marks High Priority

    With a neat sketch/diagram, explain the layout of a hydroelectric power plant and the functions of its components.

    Predicted for DEC-2026

  4. Unit 17 Marks High Priority

    Explain the flow duration curve and power duration curve of a hydroelectric plant.

    Predicted for DEC-2026

  5. Unit 27 Marks High Priority

    Draw a typical layout/diagram of a steam (thermal) power plant and explain its main features/operation.

    Predicted for DEC-2026

  6. Unit 27 Marks High Priority

    Explain a high-pressure boiler with neat sketch, construction, working principle, advantages and applications.

    Predicted for DEC-2026

  7. Unit 37 Marks High Priority

    Explain how wind energy is converted into electrical energy with diagram.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    Explain the principle and working of solar PV system / solar cell with diagram.

    Predicted for DEC-2026

  9. Unit 37 Marks High Priority

    Explain the working principle of the Magneto-Hydro Dynamic (MHD) power generation system with a neat diagram, including its advantages, disadvantages and applications.

    Predicted for DEC-2026

  10. Unit 47 Marks High Priority

    Explain the working and layout of a (simple) gas turbine power plant with a neat sketch / block diagram naming the components.

    Predicted for DEC-2026

  11. Unit 47 Marks High Priority

    Explain the procedure for disposal of nuclear waste in a nuclear power plant.

    Predicted for DEC-2026

  12. Unit 47 Marks High Priority

    Differentiate between nuclear fission and nuclear fusion and state the function of a moderator in a nuclear reactor.

    Predicted for DEC-2026

  13. Unit 57 Marks High Priority

    The fuel costs of two units of a plant are F1 = 0.2P1^2 + 40P1 + 120 Rs/h and F2 = 0.25P2^2 + 30P2 + 150 Rs/h where P1, P2 are in MW. For a total load of 250 MW, find the optimal economic dispatch P1, P2, incremental cost, total generation cost and savings over equal sharing of load.

    Predicted for DEC-2026

  14. Unit 57 Marks High Priority

    Define tariff and discuss/compare the various types of tariffs used for charging consumers of electrical energy in practice.

    Predicted for DEC-2026

  15. Unit 57 Marks High Priority

    Discuss the economics / cost of electrical power generation and the various types of costs involved.

    Predicted for DEC-2026

  16. Unit 57 Marks High Priority

    The maximum demand of a power plant is 50 MW. The capacity factor is 0.4 and the utilization factor is 0.8. Find the load factor, plant capacity, reserve capacity and annual energy production.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in