Skip to content
CE-702 (D) · Structural Design and Drawing (RCC-II)/Important Questions

Structural Design and Drawing (RCC-II) (CE-702 (D)) - Important Questions

  1. 7 Marks High Priority Asked: 2025, 2020

    Discuss various factors to be considered for determination of the general dimension of the rectangular shear walls.

    Appeared 2x (2025, 2020)

  2. 14 Marks Medium Priority Asked: 2024, 2020

    Determine lateral forces on an inner frame due to wind load and earthquake loads for a multi-storey three-bay building at Delhi.

    Appeared 2x (2024, 2020)

  3. 14 Marks Medium Priority Asked: 2023

    Explain what is understood by sway and non-sway buildings.

    Appeared 1x (2023)

  4. 14 Marks High Priority Asked: 2025

    Design a full cantilever retaining wall for given height, soil properties and SBC

    Appeared 1x (2025)

  5. 7 Marks High Priority Asked: 2025

    Discuss design considerations of earth pressure for retaining walls

    Appeared 1x (2025)

  6. 7 Marks Medium Priority Asked: 2024, 2020

    Explain functions of retaining wall and components of counterfort type retaining wall

    Appeared 2x (2024, 2020)

  7. 14 Marks Medium Priority Asked: 2024

    Design a counterfort retaining wall for given height, soil properties and counterfort spacing

    Appeared 1x (2024)

  8. 7 Marks Medium Priority Asked: 2024

    Calculate the earth pressure acting on a cantilever retaining wall of given height

    Appeared 1x (2024)

  9. 14 Marks Medium Priority Asked: 2023, 2020

    Design the stem of a cantilever retaining wall to retain earth with horizontal top

    Appeared 2x (2023, 2020)

  10. 14 Marks Medium Priority Asked: 2023

    Explain what retaining walls are, why they are provided, and cantilever retaining wall

    Appeared 1x (2023)

  11. 14 Marks High Priority Asked: 2025, 2023

    Design a circular water tank with rigid/integral wall-base joint (resting on ground), including wall thickness and reinforcement detailing.

    Appeared 2x (2025, 2023)

  12. 14 Marks Medium Priority Asked: 2024

    Design a rectangular water tank resting on ground with walls rigidly joined at vertical edges and base and free at top.

    Appeared 1x (2024)

  13. 14 Marks Medium Priority Asked: 2023

    Design top dome, top ring beam and cylindrical wall of an intze tank of capacity $1000 \text{ kL}$ litres. Use M30 grade of concrete and steel of grade Fe 415.

    Appeared 1x (2023)

  14. 14 Marks High Priority Asked: 2025, 2023

    Design a circular steel silo side wall for given height, diameter and stored material properties.

    Appeared 2x (2025, 2023)

  15. 7 Marks High Priority Asked: 2025

    Explain why cylindrical shapes are preferred for silos.

    Appeared 1x (2025)

  16. 14 Marks Medium Priority Asked: 2024, 2020

    Explain the difference between silo and bunker and discuss design of hopper bottom.

    Appeared 2x (2024, 2020)

  17. 14 Marks High Priority Asked: 2025, 2024, 2020

    Calculate the loss of prestress in a pretensioned concrete beam due to elastic shortening, shrinkage, creep and relaxation.

    Appeared 3x (2025, 2024, 2020)

  18. 14 Marks High Priority Asked: 2024, 2023, 2020

    Design a reinforced concrete solid slab bridge for IRC loading given effective/clear span, carriageway width, wearing coat, and material grades.

    Appeared 3x (2024, 2023, 2020)

  19. 14 Marks High Priority Asked: 2025

    Determine the flexural reinforcement at midspan of a continuous T-beam for a given factored moment, span, cross-section and materials.

    Appeared 1x (2025)

  20. 14 Marks High Priority Asked: 2025

    Write short note on types of prestressing with other topics such as sway buildings, retaining walls, silos and bridge girder.

    Appeared 1x (2025)

  21. 7 Marks High Priority Asked: 2025

    Discuss the IRC loading standards for highway bridge design.

    Appeared 1x (2025)

  22. 14 Marks Medium Priority Asked: 2024

    Write short notes on pre and post tensioning system, losses in prestressing and methods/types of prestressing with other topics.

    Appeared 1x (2024)

  23. 14 Marks Medium Priority Asked: 2023

    Explain pre-stressing and discuss its advantages and disadvantages.

    Appeared 1x (2023)

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in