Quantity surveying & Costing (CE-503 (C)) - Important Questions
-
Unit 17 Marks High Priority
Explain the purpose, importance and principles of estimating and the general rules for measurement of items of work.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Explain the different types of approximate / rough estimates such as plinth area rate, cubical content rate, preliminary, original, revised and supplementary estimates with example.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Explain the long wall and short wall method of estimating a building with example.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Explain mode of measurement, measurement sheet and abstract sheet for preparation of bill of quantities.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
What is rate analysis? Explain the various factors affecting the rate of an item of work.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Calculate the quantities of cement, sand and aggregate required for 25 cu.m of R.C.C. 1:2:4 concrete work.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
What is Current Schedule of Rates (C.S.R.)? Explain its importance in estimation and costing.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain the procedure for the preparation of a detailed estimate of a building.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain in detail the cost estimation for building services such as water supply, drainage and electrification.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Explain the method of estimating culverts with measurement details.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Find the volume of earthwork in an embankment of length 0.5 km, top width 4 m, depth 2 m with side slopes 1.5:1.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain factors affecting cost of works, key construction stages and approximate cost percentages.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
What is overhead cost? Explain overhead charges, expenses included therein, contingencies and work charge establishment.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Define sinking fund, explain how it is determined and its importance in valuation.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Explain the different methods of valuation of buildings and purpose of valuation.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Explain the method of fixation of standard rent of a building.
Predicted for DEC-2026