Quantity surveying & Costing (CE-503 (C)) - Important Questions
-
7 Marks High Priority Asked: 2025, 2024
Explain the purpose, importance and principles of estimating and the general rules for measurement of items of work.
Appeared 3x (2025, 2024)
-
7 Marks High Priority Asked: 2025
Prepare rough estimate by cubical content method for G+2 commercial complex with plinth area $500\, \text{m}^2$/floor, storey height $3.5\text{m}$, and percentage additions for water supply, electrification, rate fluctuation, contractor profit and contingencies.
Appeared 2x (2025)
-
8 Marks High Priority Asked: 2025, 2024
Explain the long wall and short wall method of estimating a building with example.
Appeared 2x (2025, 2024)
-
6 Marks High Priority Asked: 2025, 2024
Explain the different types of approximate / rough estimates such as plinth area rate, cubical content rate, preliminary, original, revised and supplementary estimates with example.
Appeared 2x (2025, 2024)
-
7 Marks High Priority Asked: 2025, 2023
Explain / differentiate between revised estimate and supplementary estimate with suitable example.
Appeared 2x (2025, 2023)
-
7 Marks Medium Priority Asked: 2025
Explain the methods of taking out quantities of items of work.
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain mode of measurement, measurement sheet and abstract sheet.
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain the difference between detailed estimate and abstract estimate.
Appeared 1x (2025)
-
8 Marks Medium Priority Asked: 2024
Prepare approximate estimate by plinth area rate method for a building with given plinth area, plinth area rate and percentage additions for architectural treatment, electrification, water supply, contingencies and supervision.
Appeared 1x (2024)
-
6 Marks Medium Priority Asked: 2024
Explain the rules for deductions in masonry and plastering work.
Appeared 1x (2024)
-
7 Marks Low Priority Asked: 2023
Explain the principle of units for various items of work in estimation.
Appeared 1x (2023)
-
7 Marks High Priority Asked: 2025, 2023
Explain the Current Schedule of Rates (CSR) and its importance.
Appeared 3x (2025, 2023)
-
8 Marks High Priority Asked: 2025, 2024
Calculate the quantities of cement, sand and aggregate required for R.C.C. concrete work.
Appeared 2x (2025, 2024)
-
6 Marks High Priority Asked: 2025, 2024
What is rate analysis? Explain the various factors affecting the rate of an item of work.
Appeared 2x (2025, 2024)
-
7 Marks Medium Priority Asked: 2025
Explain what is meant by task for an average artisan and its significance.
Appeared 1x (2025)
-
6 Marks Medium Priority Asked: 2024
Define task work and state the factors affecting task work.
Appeared 1x (2024)
-
7 Marks Low Priority Asked: 2023
Explain the various factors affecting rate analysis.
Appeared 1x (2023)
-
7 Marks Low Priority Asked: 2023
Prepare the rate analysis for lime concrete in foundation with 40 mm down brick ballast, lime and surkhi in proportion 1:2:6.
Appeared 1x (2023)
-
7 Marks High Priority Asked: 2025
Explain in detail the cost estimation for building services such as drainage and electrification, including water supply.
Appeared 2x (2025)
-
7 Marks High Priority Asked: 2025, 2023
Explain the procedure for the preparation of a detailed estimate
Appeared 2x (2025, 2023)
-
7 Marks Medium Priority Asked: 2025
Discuss the factors to be considered during preparation of a detailed estimate
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain earthwork calculations for roads and estimation of R.C.C. works.
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain the method of estimating culverts.
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Find the volume of earthwork in an embankment of given length, top width, depth and side slopes.
Appeared 1x (2025)
-
8 Marks Medium Priority Asked: 2024
Calculate earthwork quantity for a road in embankment and cutting using the mean sectional area method from formation levels and gradients.
Appeared 1x (2024)
-
6 Marks Medium Priority Asked: 2024
Explain the data required for preparation of detailed estimate
Appeared 1x (2024)
-
14 Marks Low Priority Asked: 2023
Prepare quantity estimate for earthwork, lime concrete, brickwork and DPC for a 5 m long wall from plan and cross-section
Appeared 1x (2023)
-
7 Marks Low Priority Asked: 2023
Explain the mid-sectional area method for calculating earthwork quantity in road estimation.
Appeared 1x (2023)
-
7 Marks Low Priority Asked: 2023
Estimate quantities of brickwork and plastering for a 4 m long, 3 m high, 30 cm thick wall and calculate cost
Appeared 1x (2023)
-
9 Marks High Priority Asked: 2025, 2024, 2023
Explain overhead charges / overhead cost, expenses included therein, work charge establishment (and contingencies, DPR)
Appeared 3x (2025, 2024, 2023)
-
7 Marks High Priority Asked: 2025
Explain factors affecting cost of works, key construction stages and approximate cost percentages
Appeared 2x (2025)
-
8 Marks Medium Priority Asked: 2024
What is DPR? Discuss the content of DPR in detail.
Appeared 1x (2024)
-
8 Marks High Priority Asked: 2025, 2024
Explain the different methods of valuation of buildings and purpose of valuation.
Appeared 2x (2025, 2024)
-
6 Marks High Priority Asked: 2024, 2023
Define/explain sinking fund, including how it is determined and its importance
Appeared 2x (2024, 2023)
-
14 Marks Medium Priority Asked: 2025
Write short notes on overhead charges, sinking fund and dual rate interest
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain the method of fixation of standard rent of a building.
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain purpose of valuation and define depreciation, sinking fund and scrap value
Appeared 1x (2025)
-
7 Marks Medium Priority Asked: 2025
Explain the methods of valuation and rent fixation of buildings.
Appeared 1x (2025)
-
7 Marks Low Priority Asked: 2023
Define Year's Purchase and calculate it for a building with given life and dual interest rates
Appeared 1x (2023)
-
7 Marks Low Priority Asked: 2023
Differentiate between scrap value vs salvage value and market value vs book value
Appeared 1x (2023)
-
7 Marks Low Priority Asked: 2023
Differentiate between Value, Cost and Price; define Valuation and function of a Valuer.
Appeared 1x (2023)
-
7 Marks Medium Priority Asked: 2025
Explain the different methods and techniques used in culvert construction.
Appeared 1x (2025)
-
14 Marks Medium Priority Asked: 2024
Write short notes on (any four)
Appeared 1x (2024)