  1. Unit 17 Marks High Priority

    Explain the classification of energy sources/resources for power generation, including primary and secondary sources, their availability/longevity and interconvertibility.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    Explain how wind energy is converted to electrical energy, including windmill components and turbine operation.

    Predicted for DEC-2026

  3. Unit 17 Marks High Priority

    Explain the working of an MHD converter with a sketch and discuss factors limiting its commercial use.

    Predicted for DEC-2026

  4. Unit 27 Marks High Priority

    What are the elements of coal handling system in a thermal power plant? Explain with the help of a neat sketch/block diagram.

    Predicted for DEC-2026

  5. Unit 17 Marks High Priority

    Compare solar energy and wind energy for Indian conditions, stating advantages of solar energy and limitations of both systems.

    Predicted for DEC-2026

  6. Unit 27 Marks High Priority

    Explain the use and working principle of forced draft and induced draft cooling towers with neat sketches.

    Predicted for DEC-2026

  7. Unit 27 Marks High Priority

    Explain the elements and working of a feed water treatment plant for a thermal power station.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    What are the functions of moderators used in nuclear reactors? Name the various moderators with their specific characteristics and properties.

    Predicted for DEC-2026

  9. Unit 37 Marks High Priority

    With a neat sketch explain the working of a pressurized heavy water reactor (PHWR).

    Predicted for DEC-2026

  10. Unit 37 Marks High Priority

    Differentiate between nuclear fission and nuclear fusion reactions with examples.

    Predicted for DEC-2026

  11. Unit 47 Marks High Priority

    Name the various hydraulic turbines with their specific characteristics. What factors are taken into account while selecting a particular turbine for a hydel power plant?

    Predicted for DEC-2026

  12. Unit 47 Marks High Priority

    Compare Micro and Pico hydro machines.

    Predicted for DEC-2026

  13. Unit 47 Marks High Priority

    Discuss the parameters/criteria on which the selection of site for a hydraulic (hydro) power plant depends.

    Predicted for DEC-2026

  14. Unit 57 Marks High Priority

    Define maximum demand, load factor, diversity factor and plant factor related to power plant economics.

    Predicted for DEC-2026

  15. Unit 514 Marks High Priority

    A power station is to supply four regions of load whose peak loads are 10 MW, 5 MW, 8 MW and 7 MW. The diversity factor of the load at the station is 1.5 and the annual load factor is 60%. Calculate the maximum demand on the station and the annual energy supplied by the station.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in