4 MarksaClassify the Pre-stressed concrete. OR Explain Freyssinet's system of pre-stressing.
How to answer
- Define classification criteria (source, timing, shape, etc.)
- List types: pre-tensioning vs post-tensioning, etc.
- Brief features of each type
- OR alternative: components of Freyssinet system
- Anchorage and jacking operation with sketch
-
10 MarksbA simply supported pre-stressed concrete beam of rectangular cross section $400\, \text{mm} \times 600\, \text{mm}$ is loaded with a total uniformly distributed load of $256\, \text{kN}$ over a span of $6.0\, \text{m}$. Sketch the distribution of stress at mid span and at end section, if the pre-stressing force is $1920.0\, \text{kN}$ and the tendon is concentric with beam section. OR Explain in detail the load balancing concept of pre-stressed structures with suitable sketches.
How to answer
- Compute cross-sectional properties A, I, Z
- Compute direct stress P/A at end and mid
- Compute bending stress My/I due to 256 kN UDL
- Superpose to get extreme fibre stresses
- Sketch stress distribution at mid-span and end section
-
4 MarksaWrite down the merits and demerits of pre-stressed concrete. OR What are the basic assumptions of pre-stressed concrete theory?
How to answer
- Define pre-stressed concrete merits (crack control, economy, etc.)
- List demerits (high strength materials, skilled labour, etc.)
- Brief explanation of each
- OR alternative: state basic assumptions (plane sections, elastic behaviour, etc.)
-
10 MarksbA post tensioned unbounded beam section $120\, \text{mm} \times 300\, \text{mm}$ is pre-stressed by 7 wires of $5\, \text{mm}$ diameter with an effective cover of $50\, \text{mm}$ and effective stress of $1200\, \text{N/mm}^2$. The beam is of $7.50\, \text{m}$ span. If M40 concrete is used and $f_p = 1600\, \text{N/mm}^2$. Find the ultimate flexural strength of the section. OR A post tensioned unbounded T-section has a flange width of $800\, \text{mm} \times 250\, \text{mm}$. The size of web of beam is $200\, \text{mm} \times 1000\, \text{mm}$. The area of high tensile wire is $4000\, \text{mm}^2$, located at $1200\, \text{mm}$ from top of flange. The characteristics strength of steel and concrete are $1500\, \text{N/mm}^2$ and $40\, \text{N/mm}^2$ respectively. Calculate the ultimate moment capacity of section using IS 1343 recommendations.
How to answer
- Compute steel area from 7 wires of 5 mm dia
- Determine effective depth and reinforcement ratio
- Check IS 1343 provisions for unbonded post-tensioned section
- Compute ultimate flexural strength / moment capacity
- OR alternative: analyse T-section flange width, neutral axis, Mu per IS 1343
-
4 MarksaWrite a short note on Anchorage zone stress. OR Explain end zone reinforcement.
How to answer
- Define anchorage zone / end block stress
- Describe bursting, spalling and bearing stresses
- Guyon / Magnel distribution concept
- OR alternative: purpose and detailing of end zone reinforcement
-
10 MarksbThe end block of post tensioned beam of $500\, \text{mm} \times 1000\, \text{mm}$ is pre-stressed by 2 cables each comprising of 5 wires of $7\, \text{mm}$ diameter. The cable is anchored by square anchor plate of $400\, \text{mm} \times 400\, \text{mm}$ with their center located at $250\, \text{mm}$ from the top and bottom edge of beam. The jacking force in the cable is $3000\, \text{kN}$. Design a suitable anchorage zone reinforcement as per the provisions of IS 1343. OR Explain the important factors influencing the deflection in a pre-stressed concrete beam and also describe differences between short term deflection and long term deflection.
How to answer
- Compute jacking force per cable and bearing stress
- Determine bursting tension per IS 1343
- Design stirrups / helical reinforcement for anchorage zone
- Detail spacing and arrangement sketch
- OR alternative: factors affecting deflection, short-term vs long-term difference
-
4 MarksaExplain the methods of achieving continuity in continuous pre-stressed beam. OR What is meant by primary moments, secondary moments and resultant moments in pre-stressed concrete?
How to answer
- Define continuity in prestressed beams
- Methods: cap cables, added reinforcement, etc.
- Construction sequence and advantages
- OR alternative: define primary, secondary and resultant moments with expressions
-
10 MarksbIn the pre-stressed beam shown below, pre-stressing is done by a parabolic cable carrying an effective pre-stress of $200\, \text{kN}$. The beam supports a uniformly distributed load of $15\, \text{kN/m}$ including self weight over whole span. Use $f_{ck} = 40\, \text{N/mm}^2$. Find the shear resistance of un-cracked section at the support. OR Explain the concordant cable and concept of linear transformation in pre-stressed concrete beam.
Given: Left diagram shows 8.0 m span beam (4.0 m + 4.0 m) with parabolic cable sag 100 mm at mid, cable 120 mm from top at supports (150 mm top mark, 50 mm bottom mark). Right diagram shows rectangular cross-section 150 mm wide x 300 mm deep with centroidal axis marked. Cable profile and dimensions needed for eccentricity and slope at support. How to answer
- Determine beam properties and prestress eccentricity from diagram
- Compute shear due to UDL and vertical component of cable
- Compute principal tensile stress / shear capacity of uncracked section
- Apply f_ck = 40 N/mm2 formula for shear resistance
- OR alternative: define concordant cable and linear transformation with sketches
-
4 MarksaExplain composite construction in Pre-stressed concrete members. OR Describe the merits and demerits of partial pre-stressing.
How to answer
- Define composite construction with precast + in-situ
- Stages of loading and propping
- Stress distribution and shear connection
- OR alternative: merits (economy, etc.) and demerits of partial prestressing
-
10 MarksbA composite T-beam is made up of pre-tensioned web $100\, \text{mm}$ wide and $200\, \text{mm}$ deep with a cast in situ slab of $400\, \text{mm}$ wide and $40\, \text{mm}$ thick, having a modulus of elasticity $28\, \text{kN/m}^2$. If the differential shrinkage is $100 \times 10^{-6}$ units, determined shrinkage stress developed in the precast and cast in situ units. OR What are the methods of achieving partial pre-stressing? Explain in details.
How to answer
- Compute modular ratio and transformed section properties
- Compute differential shrinkage strain effect
- Compute shrinkage stresses in precast web and in-situ slab
- State nature (tensile/compressive) and magnitude
- OR alternative: methods of partial prestressing (untensioned steel, etc.)
-
14 MarksA post tensioned concrete beam $100\, \text{mm} \times 300\, \text{mm}$ of $10\, \text{m}$ span is pre-stressed successively tensioned and anchored by 3 cables each having cross sectional area $200\, \text{mm}^2$. Initial pre-stress is $1200\, \text{N/mm}^2$. First cable is parabolic with $e = 50\, \text{mm}$ at mid span and $50\, \text{mm}$ above neutral axis at support. Second cable is also parabolic with $e = 50\, \text{mm}$ at mid span and zero eccentricity at support. Third cable is straight with $50\, \text{mm}$ eccentricity. Calculate the loss of pre-stress due to elastic deformation. Take $m = 6$. OR Define loss of pre-stress. Explain different losses of pre-stress in pre-tensioned and post-tensioned concrete.
How to answer
- Compute prestress force per cable (A x initial stress)
- Compute concrete stress at cable levels due to successive tensioning
- Apply m=6 for elastic loss in each cable
- Sum losses for three cables with different profiles
- OR alternative: define loss, list friction, anchorage, elastic, creep, shrinkage, relaxation
-
14 MarksDesign a post-tensioned girder, which is spaced $2.40\, \text{m}$ c/c and has an effective span of $9.0\, \text{m}$. The dead load over beam is $3.0\, \text{kN/m}^2$ excluding self weight. The beam is subjected to a live load $15\, \text{kN/m}^2$ over whole span. The permissible compressive stress at transfer stage and at working stage is $14\, \text{N/mm}^2$ and $12\, \text{N/mm}^2$ respectively. The permissible tensile stress at all stages of loading is $1.0\, \text{N/mm}^2$. Consider loss ratio of $0.80$. Determine number of $7.0\, \text{mm}$ wires required if permissible tensile stress in wire is $1000\, \text{N/mm}^2$. Assume cover equal to $100\, \text{mm}$. OR Design a pre-stressed concrete I-beam to carry load of $12\, \text{kN/m}$ over simply supported span of $25.0\, \text{m}$. The permissible stress in concrete at transfer stage and at working stage is $14\, \text{N/mm}^2$ and $12\, \text{N/mm}^2$ respectively. Initial stress in cable is $1000\, \text{N/mm}^2$. Loss of pre-stress is $20.0\%$. Adopt Freyssinet cable 12 numbers and $5.0\, \text{mm}$ diameter.
How to answer
- Compute design load from spacing, dead + live + self weight
- Determine required section modulus using permissible stresses and loss ratio
- Select section and compute prestress force and eccentricity
- Determine number of 7 mm wires with 1000 N/mm2
- OR alternative: design I-beam for 12 kN/m over 25 m similarly
-
6 MarksaWrite short notes on any two: $2 \times 3 = 6$
- i)Stress concept in pre-stress
- ii)Tendon and tendon profile
- iii)Guyon's method
- iv)Concept of stress distribution in end block
How to answer
- Define stress concept / tendon profile / Guyon method / end block distribution
- Explain with formulas and sketches
- State applications
- Select any two items as required
-
8 MarksbWrite short note on any two: $2 \times 4 = 8$
- i)Types of flexural failures in concrete
- ii)Hoye's system of pre-stressing with neat sketch
- iii)Differences between pre-tensioned and post-tensioned
- iv)Why mild steel cannot be used in pre-stressing
How to answer
- Define types of flexural failures / Hoye system / pre vs post tension / mild steel issue
- Explain with neat sketch where needed
- Compare characteristics
- Select any two items
Go to where you left off?
Quick Add to Notes
Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.
Create free accountHave an account? Log in
Notes Panel