  1. Unit 17 Marks High Priority

    What do you mean by coning of wheels? Discuss its advantages with neat sketch.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    What are the requirements of a good ballast? Discuss the different materials used as ballast and their comparative performance.

    Predicted for DEC-2026

  3. Unit 17 Marks High Priority

    Define hauling capacity and tractive effort. Derive the formula for tractive effort and explain the factors affecting it.

    Predicted for DEC-2026

  4. Unit 27 Marks High Priority

    Explain super elevation and with a neat sketch explain advantages of negative super elevation.

    Predicted for DEC-2026

  5. Unit 27 Marks High Priority

    Define super elevation. Derive the formula for equilibrium cant and explain the concept of cant deficiency.

    Predicted for DEC-2026

  6. Unit 27 Marks High Priority

    Explain the principles of signaling and interlocking and their role in safety and efficiency of train operation.

    Predicted for DEC-2026

  7. Unit 37 Marks High Priority

    Explain economical span, clearance and afflux / back water and their factors / effects in bridge design.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    Describe the procedure for estimating scour depth for a bridge foundation. Why is it critical for bridge safety?

    Predicted for DEC-2026

  9. Unit 37 Marks High Priority

    Explain the design loads and forces acting on bridges including impact factor and the Indian loading standards for railway and highway bridges.

    Predicted for DEC-2026

  10. Unit 47 Marks High Priority

    What are well foundations? Explain well sinking and the precautions to be taken while sinking of well.

    Predicted for DEC-2026

  11. Unit 47 Marks High Priority

    What are cofferdams? Describe their types, construction methods and use in underwater bridge construction.

    Predicted for DEC-2026

  12. Unit 47 Marks High Priority

    Explain the different methods and techniques used for strengthening of bridges and the reasons for strengthening.

    Predicted for DEC-2026

  13. Unit 57 Marks High Priority

    What are tunnel shafts and pilot shafts? Describe their purpose, construction and design considerations for tunnel approaches.

    Predicted for DEC-2026

  14. Unit 57 Marks High Priority

    Why is drainage important in tunnels? Describe the methods of drainage and ventilation in tunnels.

    Predicted for DEC-2026

  15. Unit 57 Marks High Priority

    Describe important tunnels in India and abroad, including their significance and engineering features / challenges.

    Predicted for DEC-2026

  16. Unit 57 Marks High Priority

    Explain how ground conditions affect tunnel construction methods and lining choice in soft soil, hard soil and rock.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in