Skip to content
ME-603 (A) · Turbomachinery/Important Questions

Turbomachinery (ME-603 (A)) - Important Questions

  1. Unit 17 Marks High Priority

    Derive the moment of momentum equation and Euler's turbine energy equation for turbomachines and give the expression for power and energy transfer.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    Explain the term degree of reaction in turbomachinery with reference to steam turbines, including 50% reaction turbine.

    Predicted for DEC-2026

  3. Unit 27 Marks High Priority

    Explain velocity compounding and pressure compounding in steam turbines with neat sketches.

    Predicted for DEC-2026

  4. Unit 27 Marks High Priority

    For a single-stage impulse turbine, draw inlet and outlet velocity triangles and calculate blade angles, whirl components, tangential and axial thrust, power developed and blading/diagram efficiency. Steam velocity 600 m/s, blade speed 250 m/s, nozzle angle 20 degrees, blade outlet angle 25 degrees, neglecting friction.

    Predicted for DEC-2026

  5. Unit 27 Marks High Priority

    What is the reheat factor in multi-stage steam turbines and why does it give higher efficiency than a single stage with the same stage efficiency?

    Predicted for DEC-2026

  6. Unit 27 Marks High Priority

    Derive the condition for maximum efficiency (blade speed ratio) of a reaction turbine stage.

    Predicted for DEC-2026

  7. Unit 37 Marks High Priority

    Explain the advantages of centrifugal pumps over reciprocating pumps.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    A Pelton wheel has a mean bucket speed of 10 m/s with a jet of water flowing at the rate of 700 litres/s under a head of 30 m. The buckets deflect the jet through an angle of 160 degrees. Calculate the power imparted to the runner and the hydraulic efficiency.

    Predicted for DEC-2026

  9. Unit 37 Marks High Priority

    Define and explain the various efficiencies - hydraulic, mechanical, volumetric and overall - of a hydraulic turbine.

    Predicted for DEC-2026

  10. Unit 47 Marks High Priority

    Differentiate between centrifugal flow compressor and axial flow compressor.

    Predicted for DEC-2026

  11. Unit 414 Marks High Priority

    State and explain the Fan Laws and discuss their engineering applications for fans, blowers and compressors.

    Predicted for DEC-2026

  12. Unit 514 Marks High Priority

    Explain the construction and working principle of a torque converter with the help of a neat diagram.

    Predicted for DEC-2026

  13. Unit 514 Marks High Priority

    Write down the applications of power transmitting devices - fluid coupling, torque converter and hydrostatic systems - at industry level.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in