Precast & Modular Construction (CE-603 (B)) - Important Questions

  1. Unit 17 Marks High Priority

    Explain in detail the concept, aims and basics of modular coordination and standardization and state its need and significance in prefabricated structures.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    Explain in brief the different types of structural systems used in prefabricated structures.

    Predicted for DEC-2026

  3. Unit 17 Marks High Priority

    Discuss the process of production, transportation and erection of precast / prefabricated elements with important aspects and considerations.

    Predicted for DEC-2026

  4. Unit 17 Marks High Priority

    Discuss the need for prefabrication in the construction industry.

    Predicted for DEC-2026

  5. Unit 17 Marks High Priority

    List out the systems of prefabrication and mention their advantages and disadvantages.

    Predicted for DEC-2026

  6. Unit 17 Marks High Priority

    Write short notes on: (i) Modular planning for a residential apartment (ii) Box prefabricates.

    Predicted for DEC-2026

  7. Unit 27 Marks High Priority

    Illustrate the classification / types of wall panels and shear walls used in precast construction.

    Predicted for DEC-2026

  8. Unit 27 Marks High Priority

    With the help of a flow chart, explain the manufacturing process of precast roof and floor slabs.

    Predicted for DEC-2026

  9. Unit 27 Marks High Priority

    Write a brief note on column structures in prefabricated construction.

    Predicted for DEC-2026

  10. Unit 27 Marks High Priority

    Discuss the various factors which influence the response / behaviour of precast structural components.

    Predicted for DEC-2026

  11. Unit 37 Marks High Priority

    Generalize the steps involved in the process of disuniting of prefabricated structures.

    Predicted for DEC-2026

  12. Unit 37 Marks High Priority

    Analyse the problems in design because of joint flexibility in precast structures.

    Predicted for DEC-2026

  13. Unit 47 Marks High Priority

    Explain connections and joints for wall panels and list out the different types of connections.

    Predicted for DEC-2026

  14. Unit 47 Marks High Priority

    Explain expansion joint and flexibility joint in prefabricated structures.

    Predicted for DEC-2026

  15. Unit 27 Marks High Priority

    Design a restrained reinforced concrete wall panel under combined vertical and horizontal loads and check its safety in shear. Take height 8 m, length 5 m, thickness 200 mm, restrained against rotation at base.

    Predicted for DEC-2026

  16. Unit 57 Marks High Priority

    Illustrate the IS code provisions for abnormal effects such as earthquakes and cyclones.

    Predicted for DEC-2026