Precast & Modular Construction (CE-603 (B)) - Important Questions
-
Unit 17 Marks High Priority
Explain in detail the concept, aims and basics of modular coordination and standardization and state its need and significance in prefabricated structures.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Explain in brief the different types of structural systems used in prefabricated structures.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Discuss the process of production, transportation and erection of precast / prefabricated elements with important aspects and considerations.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Discuss the need for prefabrication in the construction industry.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
List out the systems of prefabrication and mention their advantages and disadvantages.
Predicted for DEC-2026
-
Unit 17 Marks High Priority
Write short notes on: (i) Modular planning for a residential apartment (ii) Box prefabricates.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Illustrate the classification / types of wall panels and shear walls used in precast construction.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
With the help of a flow chart, explain the manufacturing process of precast roof and floor slabs.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Write a brief note on column structures in prefabricated construction.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Discuss the various factors which influence the response / behaviour of precast structural components.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Generalize the steps involved in the process of disuniting of prefabricated structures.
Predicted for DEC-2026
-
Unit 37 Marks High Priority
Analyse the problems in design because of joint flexibility in precast structures.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain connections and joints for wall panels and list out the different types of connections.
Predicted for DEC-2026
-
Unit 47 Marks High Priority
Explain expansion joint and flexibility joint in prefabricated structures.
Predicted for DEC-2026
-
Unit 27 Marks High Priority
Design a restrained reinforced concrete wall panel under combined vertical and horizontal loads and check its safety in shear. Take height 8 m, length 5 m, thickness 200 mm, restrained against rotation at base.
Predicted for DEC-2026
-
Unit 57 Marks High Priority
Illustrate the IS code provisions for abnormal effects such as earthquakes and cyclones.
Predicted for DEC-2026