7 MarksaExplain the purpose and importance of estimates. Describe the principles of estimating.
How to answer
- Define estimate and its purpose - funds, control, planning
- Importance - feasibility, tendering, execution control
- Principles of estimating - accuracy, rates, measurements, contingencies
- Steps and documents - measurement, abstract, specifications
-
7 MarksbExplain the methods of taking out quantities of items of work.
How to answer
- Need for taking out quantities - measurement rules
- Long wall-short wall method - steps
- Centre line method - steps and applicability
- Comparison and example of deductions
-
7 MarksaExplain mode of measurement, measurement sheet and abstract sheet.
How to answer
- Mode of measurement - IS 1200 rules, units
- Measurement sheet format and entries
- Abstract sheet purpose and format
- Linkage from measurement to cost
-
7 MarksbDescribe different types of estimates such as plinth area rate, cubical content rate, preliminary, original, revised and supplementary estimates.
How to answer
- Define plinth area and cubical content estimates
- Preliminary vs original estimate
- Revised and supplementary estimates - when needed
- Uses in approval and cost control
-
7 MarksaWhat is rate analysis? Explain the various factors affecting the rate of an item of work.
How to answer
- Define rate analysis and its purpose
- Components - materials, labour, overhead, profit
- Factors - location, specifications, quantities, rates
- Task work and market fluctuations
-
7 MarksbPrepare the rough estimate for a proposed commercial complex for a municipal corporation for the following data. - Plinth Area = $500\, m^2$/floor - Ht of each storey = $3.5 m$ No. of storey's = G+2 - Cubical content rate = Rs. $1000/\, m^3$ - Provided for a following as a percentage of structured cost - Water supply & Sanitary arrangement - $8\%$ - Electrification - $6\%$ - Fluctuation of rates - $5\%$ - Contractor's profit - $10\%$ - Petty supervision & contingencies - $3\%$
How to answer
- Compute cubical content = plinth area x height x storeys
- Structure cost = volume x cubical rate
- Add percentages for services, fluctuation, profit, contingencies
- Arrive total rough estimate amount
-
7 MarksaWhat is task for an average artisan? Explain its significance.
How to answer
- Define task / out-turn work for artisan
- Standard task values for common items
- Significance in labour calculation and rate analysis
- Factors affecting task
-
7 MarksbWhat is Current Schedule of Rates (C.S.R.)? Explain its importance.
How to answer
- Define C.S.R. - district schedule of rates
- Contents - material, labour, item rates
- Importance in estimating and tendering
- Revision and use in rate analysis
-
7 MarksaExplain the procedure for preparing detailed estimates of buildings.
How to answer
- Drawings, specifications and site study
- Taking out quantities item-wise
- Abstracting, rate provision and totals
- Report, contingencies and approval
-
7 MarksbExplain earthwork calculations for roads and estimation of R.C.C. works.
How to answer
- Earthwork - cross-sections, mean area, prismoidal formula
- Lead, lift and mass diagram concept
- R.C.C. measurement - concrete vs steel separately
- Bar bending schedule and deductions
-
7 MarksaExplain the method of estimating culverts.
How to answer
- Types of culverts - slab, pipe, box
- Components - abutments, deck, wing walls
- Measurement sequence item-wise
- Abstract and typical quantities
-
7 MarksbExplain estimation of building services such as water supply, drainage and electrification.
How to answer
- Water supply items - pipes, fittings, storage
- Drainage / sanitation items and measurement
- Electrification points and wiring measurement
- Lump-sum vs detailed provision
-
7 MarksaExplain the factors affecting the cost of works.
How to answer
- Material, labour and site conditions
- Specifications, design and scale of work
- Market, transport and time factors
- Overheads and statutory charges
-
7 MarksbExplain overhead charges, contingencies and work charge establishment.
How to answer
- Define overhead charges with examples
- Contingencies - purpose and % provision
- Work charge establishment - meaning and charges
- How each is provided in estimate
-
7 MarksaExplain the purpose of valuation. Define depreciation, sinking fund and scrap value.
How to answer
- Purpose of valuation - sale, tax, rent, compensation
- Define depreciation and its causes
- Sinking fund concept and formula
- Scrap / salvage value definition
-
7 MarksbExplain the methods of valuation and rent fixation of buildings.
How to answer
- Rental, direct comparison, profit-based methods
- Depreciation / cost method steps
- Rent fixation - gross vs net, outgoings
- Standard rent and market rent
Go to where you left off?
Quick Add to Notes
Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.
Create free accountHave an account? Log in
Notes Panel