Skip to content
CE-402 · Construction Technology/Important Questions

Construction Technology (CE-402) - Important Questions

  1. Unit 17 Marks High Priority

    Explain grillage foundation, its types and uses with a neat sketch.

    Predicted for DEC-2026

  2. Unit 17 Marks High Priority

    What is the purpose of pile foundations? Explain their classification based on different criteria with advantages and disadvantages.

    Predicted for DEC-2026

  3. Unit 17 Marks High Priority

    Explain the essential requirements of foundations and discuss footing types and depth of footings with sketches.

    Predicted for DEC-2026

  4. Unit 27 Marks High Priority

    Explain what temporary structures are and describe the design and construction features / types of temporary structures such as scaffolding, shoring and falsework.

    Predicted for DEC-2026

  5. Unit 27 Marks High Priority

    Explain the different types of formwork used in concrete construction with neat sketches.

    Predicted for DEC-2026

  6. Unit 27 Marks High Priority

    Explain and compare stationary formwork and slip formwork techniques, including advantages and limitations.

    Predicted for DEC-2026

  7. Unit 37 Marks High Priority

    Explain the techniques, methods and materials used for damp prevention / damp-proofing and waterproofing in buildings.

    Predicted for DEC-2026

  8. Unit 37 Marks High Priority

    Explain the different types of stone masonry, including rubble masonry and ashlar masonry, with neat sketches.

    Predicted for DEC-2026

  9. Unit 37 Marks High Priority

    What are the types of stairs? Explain rules of proportionality, design and construction of dog-legged and open-well stairs with sketches.

    Predicted for DEC-2026

  10. Unit 37 Marks High Priority

    Explain types of doors, windows and ventilators based on materials, size, location and fittings with sketches.

    Predicted for DEC-2026

  11. Unit 37 Marks High Priority

    Write short notes on plastering and pointing, white and colour washing and distempering.

    Predicted for DEC-2026

  12. Unit 47 Marks High Priority

    Explain the types of ground floors / floorings in detail including construction, characteristics, applications, advantages and limitations with neat diagram.

    Predicted for DEC-2026

  13. Unit 47 Marks High Priority

    Discuss pitched roofs, single roofs, double or purlin roofs, trussed roofs and steel roof trusses with neat sketches.

    Predicted for DEC-2026

  14. Unit 57 Marks High Priority

    Explain the general principles for planning and construction of earthquake-resistant buildings to achieve seismic protection.

    Predicted for DEC-2026

  15. Unit 57 Marks High Priority

    What is base isolation in earthquake-resistant buildings? Explain components including isolators, bearings and damping devices.

    Predicted for DEC-2026

  16. Unit 57 Marks High Priority

    Explain construction of walls for earthquake resistance with provision of corner reinforcement, placement and anchoring.

    Predicted for DEC-2026

Go to where you left off?

Quick Add to Notes

Save questions, your own notes and screenshots into notes filed by unit. It takes a free account.

Create free account

Have an account? Log in